manage news

manage news

Second Sweetening Unit of Phase 19 Refinery Went Operational
Second Sweetening Unit of Phase 19 Refinery Went Operational

Second Sweetening Unit of Phase 19 Refinery Went Operational

  2016 July 23
The second sweetening unit of Phase 19 Refinery was commissioned on Tir 22, 1395 (July 12, 2016) as a result of the unsparing attempts made by specialists and experts affiliated to Petropars.
Based on a report released by the Public Relations and International Affairs Department of Petropars Group, upon early commissioning of the first gas sweetening row in Ordibehesht 1395 (May 2016), the untiring and hardworking employees of Petropars at Phase 19, relying on round-the clock efforts and unsparing attempts, managed to successfully operationalize and commission the second sweetening unit of Phase19 (GTU1).
Phase 19 of South Pars Gas Field is pioneer in implementation of the new projects for development of gas fields at South Pars Gas Field as the first platform of this phase (19C) was erected on position and was commissioned lately to increase by double-fold the production capacity of Phase 19 Refinery.
Phase 19 of South Pars Gas Field is pioneer in implementation of the new projects for development of gas fields at South Pars Gas Field as the first platform of this phase (19C) was erected on position and was commissioned lately to increase by double-fold the production capacity of Phase 19 Refinery.
It should be noted that the Refinery of Phase 19 holds 4 rows for sweetening of sour gas the capacity of each of which measures 500 million standard cubic feet per day.

 

Send a comment

CAPTCHA image
Enter the code shown above:

Comments

There are currently no comments. You can be the first to you comment.