manage news

manage news

Desalter unit of South Azadegan Central Treatment Export Plant (CTEP) installed
Desalter unit of South Azadegan Central Treatment Export Plant (CTEP) installed

Desalter unit of South Azadegan Central Treatment Export Plant (CTEP) installed

  2021 May 24

According to the report of Public Relations and International Affairs of Petropars Group, The system, which is responsible for desalination of crude oil with an approximate weight of 300 tons and a length of 40 meters and a diameter of 6 meters, was installed in its place after the completion of piling operations and the construction of foundation.
The construction and installation of these systems has been done by the powerful domestic experts.
 

Send a comment

CAPTCHA image
Enter the code shown above:

Comments

There are currently no comments. You can be the first to you comment.