Venezuelan Oil Minister Visits Jose Terminal Project Progress// 31% Progress Achieved in Four Months by Petropars at Jose Terminal
According to the Public Relations and International Affairs Department of Petropars Group, Pedro Rafael Tellechea, the Venezuelan Oil Minister, inspected the progress on the reconstruction of tanks TA1-T-01 and TA1-T-02 at the Western Terminal, presented by Engineer Akhlaqi. During this visit, the minister reviewed the engineering and technical activities of Petropars Group, following up on the project's progress.
The project, carried out by PDVSA and the Iranian company Petropars, involves repairs to pumps, storage tanks, and loading arms. Four months into the project, a 31% progress has been achieved, surpassing the planned 22%. Minister Tellechea expressed satisfaction with the project's status and emphasized expanding cooperation with Petropars in other oil and gas projects in Venezuela.