Belal Gas Field Development
Belal Gas Field Development

  Belal Gas Field Development

Belal gas field is located in 40 km east of South Pars and in the border of Iran & Qatar. Exploration Management Team explored Belal gas field on 2003.
The contract for the development of the Belal gas field project was signed on September 14, 2019 with the participation of the Minister of Petroleum and the CEO of Pars Oil and Gas Company and the Managing Director of Petropars

General Information

  •    Belal Gas field will be managed by POGC and Belal oil field is being managed by IOOC.
  •    Belal gas field is 1 km away from Belal oil field.
  •    Drilled Gas will be transported to SPD12C and then will be transferred to onshore plant via a pipeline.

Initial Gas In place(IGIP)

  • 2.7 TSCF in Kangan & Dalan sublayers (More gas volume is expectable)

Production Rate

  • Produce 500 MMSCFD with plateau rate period of about 4-5 years

Project Description

  • Production Topside: 2300 Ton dry weight approximately with 4 decks for 500MMSCFD
  • Jacket : 2100 Ton weight approximately (excluding piles)
  • Pipeline: 20’’ Dia and 23Km length
  • Well Drilling 1 Appraisal Well
  • Well Drilling 1 Learning Well
  • Well Drilling 6 Developing Well
  • Average Drilling Length: 4200 m        
  • Total Well Drilling: 34000 m

Project Name:

Belal Gas Field Development

Location:

The Belal field (East Wing of South Pars Gas Field Development) is located about 100 km to the South West of Lavan Island and 40 Km South East of South Pars field, near the Iranian-Qatari border, Iran

Client:

POGC

Contract Type:

General Contract (GC)

Start date:

23-Feb-2021

Target:

Production of gas and condensate in the amount of 500 million ft3 and 15 thousand bpd and transfer it through the interphase pipeline to platform 12A and phase 12 refinery.

Scope of Work:

One offshore WH jacket with 15 slots.

• One unmanned wellhead topside for the project, equipped with the required production facilities.

• One relief platform, connected by bridge to the wellhead platform.

• One 20” offshore pipeline (with 4.5“piggy-back line) with the length of about 30 kilometers of 500 MMSCFD nominal capacity that will be installed to transport the raw offshore production from wellhead platform up to the SPD 12A platform along with provision of fiber optic cable. 

• Drilling and Completing of Eight wells including one appraisal/ exploration well, one learning well and six development wells with average length of 4200m