PROJECTS

PROJECTS

Skip Navigation Links.
Cheshmeh Khosh oilfield (two new disposal wells & two sidetracking/deepening wells)
Cheshmeh Khosh oilfield (two new disposal wells & two sidetracking/deepening wells)

  Cheshmeh Khosh oilfield (two new disposal wells & two sidetracking/deepening wells)

Client: ZN Vostok Ltd.

Contractor: Petropars Kish Oilfields Service Company ( POSCO )

Client: ZN Vostok Ltd.

Contractor: Petropars Kish Oilfields Service Company ( POSCO )

Purpose

  • Total of two (2) sidetracking/deepening wells from existing wells in the Cheshmeh khosh oil Field to Asmari formation and then two (2) new disposal wells in the Cheshmeh khosh oil Field to Asmari formation using two (2) land rigs.

Scope of Work

  • Cheshmeh Khosh original wells will be sidetracked/re-drilled to increase the depth inside Asmari formation to be used as water injection wells.
  • Cheshmeh Khosh new disposal wells have vertical trajectory and will be drilled to inside Asmari formation. The production formation will be cased with 7” liner and perforated in front of water injection zones.

Project Name:

Cheshmeh-Khosh Oil Field Development Plan

Location:

The Northen part of the Dezful embayment, near the southeast of Lurestan border, 180 km Northwest of Ahwaz, Iran

Client:

ZN Vostok Company

Contract Type:

EPD-Lump sum

Start date:

04-Nov-2022

Target:

• Drilling of 2 new Well

• Work over of 2 Well

Scope of Work:

The wells of the first phase of the plan include 2 diversion wells in the existing wells in the Cheshme Khosh field and then the drilling of 2 new injection wells with 2 onshore drilling rigs

Picture