Increasing the Storage and Dispatch Capacity of TAECJAA
Increasing the Storage and Dispatch Capacity of TAECJAA
Client:PETRÓLEOS DE VENEZUELA, S.A. (PDVSA)
Contract Type: EPC-Lump sum
Start date: 30-Jan-2024
Target:
• Increasing loading capacity by 200 thousand barrels per hour
• Increasing storage capacity by 1.2 million barrels (crude oil
and condensate)
• Recovery of transmission capacity (pumping) at the rate of
270 thousand barrels per hour
Scope of Work:
• Description of Venezuela: Repair of 8 loading arms with a
capacity of 25,000 barrels per hour each
• Reconstruction of 1 storage tank of 500 thousand barrels and
repair of 2 storage tanks of 350 thousand barrels
• Repair and overhaul of the western pumping station consisting
of 14 electric pumps with a total capacity of 210 thousand
barrels per hour
• Repair and overhaul of the eastern pumping station consisting
of 13 electric pumps with a total capacity of 60 thousand
barrels per hour
Project Name:
|
Increasing the Storage and Dispatch Capacity of TAECJAA
|
Location:
|
Jose export terminal, Anzoategui Province,Venezuela
|
Client:
|
PETRÓLEOS DE VENEZUELA, S.A. (PDVSA)
|
Contract Type:
|
EPC-Lump sum
|
Start date:
|
30-Jan-2024
|
Target:
|
• Increasing loading capacity by 200 thousand barrels per hour
• Increasing storage capacity by 1.2 million barrels (crude oil and condensate)
• Recovery of transmission capacity (pumping) at the rate of 270 thousand barrels per hour
|
Scope of Work:
|
• Description of Venezuela: Repair of 8 loading arms with a capacity of 25,000 barrels per hour each
• Reconstruction of 1 storage tank of 500 thousand barrels and repair of 2 storage tanks of 350 thousand barrels
• Repair and overhaul of the western pumping station consisting of 14 electric pumps with a total capacity of 210 thousand barrels per hour
• Repair and overhaul of the eastern pumping station consisting of 13 electric pumps with a total capacity of 60 thousand barrels per hour
|
Picture